By Donna Westfall – May 24, 2010
WWTP = Wastewater Treatment Plant
$4.5 million difference between Wahlund’s bid and Engineers Estimate
$9,000 paid to Stover Engineering for Labor Compliance.
*$895,000 additional approved for Stover Engineering. — Approved 4-1 vote on 5/3/2010
*$35,000 approved for designer error. — Approved 4-1 vote on 5/3/2010
*$4,000,000 additional net added to interest on the State Revolving Loan with the “poison pill”
MY CONSTITUENTS DON’T BUY IT!
Documentation provided to back-up claims ignored.
Prop 218, Recalls, sewer rate rollbacks and fluoride initiatives.
Former City Clerk Dianne Nickerson resigns after recall attempt concerning allegations that she falsified Prop 218 protest vote.
Biased news reporting by local media.
MY CONSTITUENTS CALL THIS CORRUPTION!
Want proof? Go to www.crescentcitytimes.com and click on each line to link to documents and information.
Respectfully,
Donna A. Westfall