Sat. Oct 5th, 2024

By CalTrans – September 13, 2024

The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change. For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN.

Del Norte County

  • U.S. 101 (27.9) – Onramp closures at East Washington Boulevard Overcrossing will occur overnight on Sunday and Monday, September 15 and 16. A full northbound onramp closure will be in effect Sunday night from 6 p.m. to 6 a.m. A full southbound onramp closure will be in effect Monday night from 6 p.m. to 6 a.m. Motorists should choose an alternate route. LC#C101LA 
  • U.S. 101 (30.8) – Ramp closures at the Route 199 interchange will occur overnight on Sunday and Monday, September 15 and 16. A full northbound 101 offramp and southbound 101 onramp closure will be in effect from 6 p.m. to 6 a.m. Motorists should choose an alternate route. LC#C101LA 
  • U.S. 101 (35.8/36.5) – Construction at the Dr. Fine Bridge near Smith River will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect 10-minute delays. LC#C101WA
  • U.S. 199 (33.2/35.3) – Construction work between the Middle Fork Smith River Bridge and Forest Road will continue. Lane closures will be in effect northbound from 6 a.m. to 6 p.m. Travelers should expect 10-minute delays. LC#C199JA

Leave a Reply

Your email address will not be published. Required fields are marked *