Press release from Caltrans District 1: – April 10, 2026
The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change.For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN.
Del Norte County
- U.S. 101 (0/3.8) – Utility work is scheduled between Humboldt County Line and Klamath Beach Road weekdays from 7 a.m. to 7 p.m. Lane and shoulder closures will be in effect. Travelers should expect minor slowdowns. LC#C101XC
- U.S. 101 (3.8/4.6) – K-Rail installation is scheduled between Klamath River Overflow Bridge 1-32 and Route 101/169 Separation 1-26 weekdays from 7 a.m. to 5 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101CA
- U.S. 101 (7.6/8.3) – K-rail work is scheduled between McMillan Road and Peine Road on Friday, April 17 from 7 a.m. to 3 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101CA
- U.S. 101 (12.2/13.8) – Emergency work is scheduled on Friday, April 10 from 6 a.m. to 5 p.m. One-way traffic control will be in effect. Travelers should expect 5-minute delays. LC#C101DD
- U.S. 101 (35.8/36.5) – The Dr. Fine Bridge Replacement Project is scheduled in the Smith River area weekdays from 7 a.m. to 7 p.m. One-way traffic control will be in effect. Travelers should expect 10-minute delays. LC#C101WA


