Thu. Dec 26th, 2024

Press release from Caltrans: – August 2, 2024

The following scheduled roadwork has been verified at the time of release. Please keep in mind work is weather permitting and subject to change. For updates to this list, visit: QuickMap at http://quickmap.dot.ca.gov, check the California Highway Information Network (CHIN) at https://roads.dot.ca.gov or call 1-800-GAS-ROAD (1-800-427-7623). For information pertaining to emergency roadwork, check QuickMap and the CHIN.

Del Norte County

  • S. 101 (3.8) – Construction at the Klamath River Overflow Bridge will occur on Tuesday, August 6. A full northbound onramp closure will be in effect from 9 a.m. to 3 p.m. Motorists should choose an alternate route. LC#X101EA
  • S. 101 (35.8/36.5) – Construction at the Dr. Fine Bridge near Smith River will continue. One-way traffic control will be in effect from 7 a.m. to 7 p.m. Motorists should expect 10-minute delays. LC#C101WA

Leave a Reply

Your email address will not be published. Required fields are marked *